12_Mukhi_From_Nepal_Large_Cv
12_Mukhi_From_Nepal_Large_Cv
12_Mukhi_From_Nepal_Large_Cv
12_Mukhi_From_Nepal_Large_Cv
12_Mukhi_From_Nepal_Large_Cv
12_Mukhi_From_Nepal_Large_Cv__undefined__undefined
12 Mukhi From Nepal Large Cv

₹15,400

₹30,800

50% Off
View Available Offers

Final Price inclusive of all taxes

Cash on Delivery

Free Delivery

Get it delivered in 3-6 days

size

28 Mm

Product Information

Mukhi

12 Mukhi


Material

Rudraksha


Country Of Origin

Nepal


Brand Name

techpandit


Pack Of

1


Ideal For

Leadership, vitality, and self-confidence

Product Description

The 12 Mukhi Rudraksha embodies the energy of the Surya Deva and empowers the wearer with qualities of the Sun like authority, brilliance, and influence. It provides relief from stress and anger rooted in feelings of victimization, worries, suspicion, fear of the future, dependency, and low self-respect. The wearer gains personal power, drive, vigor, excellent health, and a commanding presence. This Rudraksha fosters leadership qualities, visionary abilities, and the motivation to take decisive action leading in achievements that bring name, fame, success, and recognition. Additionally, it supports overall health and aids in better digestion.
The 12 Mukhi Rudraksha is ruled by the Sun. It enhances the positive effects and mitigates the negative ones. The Sun, the source of life, bestows vigor and strength upon us. It signifies self-consciousness and guides us forward. A prominently positioned Sun makes an individual vibrant and captivating. It illustrates the significance of utilizing our personal power instead of relinquishing it to others. When we exhibit the characteristics of the Sun, we are purposeful, motivated, confident, and creative. The Sun's position in our chart symbolizes our life's purpose. It bestows vitality, determination, intelligence, prosperity in worldly matters, and influences behavior, productivity, happiness, drive, and reputation.
Benefits of 12 Mukhi Rudraksha
Enhances vitality and motivation.
Develops leadership qualities and brings recognition, prestige, and achievement.
Helps to reduce suspicion, low self-esteem, stress, and anger that may arise from dependency.
Strengthens the digestive system and gives relief in ailments of the stomach, liver, and small intestine.
Ruling Deity: Surya
Ruling Planet: Sun
Beej Mantra: Om Kraum Sraum Raum Namah
The bead depicted in the above image will be dispatched to you.
Size Grade Guide
Nepal beads are larger in size and vary from 14mm (small) to 40mm (collector) with an average size of 20mm. Java beads are much smaller in size, from 2mm (small) to 25mm (collector) with an average size of 12mm. Both varieties are categorized into Small, Regular, Large, Collector, and Super Collector sizes.
Nepal Large (L): Powerful storehouses of bio-energy, with noticeable effects for energetically sensitive individuals.
Nepal vs. Java
Nepal beads are larger, with deeply etched mukhi lines and pronounced thorns, giving them a textured surface and a higher intensity of healing frequency. Java beads are smaller, with softer thorns and a smoother surface, and their mukhi lines are less deeply etched. As a result, they may take slightly longer to show results. However, both types of Rudraksha provide nearly identical benefits over time when worn the right way.
Nepal Rudraksha may be a better choice for those seeking faster effects, while Java beads appeal to those who prefer a smaller, more fashionable option for daily wear, such as in bracelets, pendants, or rings. Due to their convenience, many people choose Java beads for therapeutic purposes. Ultimately, the choice depends on personal preference and lifestyle.

  • Feature: Enhances vitality and motivation.

  • Feature: Develops leadership qualities and brings recognition, prestige, and achievement.

  • Helps To Reduce Suspicion, Low Self: esteem, stress, and anger that may arise from dependency.

  • Feature: Strengthens the digestive system and gives relief in ailments of the stomach, liver, and small intestine.